Pump Chamber & Septic Tank Installation – Lakewood Heights Development, Merrimac, MA

April 20, 2015 / Featured Projects

ABOUT THE PROJECT

Our pump chamber and septic tank project consisted of installing a Pump Chamber 96” ID x 11VF and two 2500 Gallon Monolithic Commercial Line Tanks used for overflow in case of emergencies. Due to water table and weather conditions the contractor was under time restraints. Shea Concrete was able to manufacture and deliver the customized pump chamber with holding tanks in a timely manner. Shea Concrete Products, using their 25 Ton QMC Delivery Truck/Crane, was able to set the products in the contractor’s already prepared excavation, allowing the contractor to quickly backfill after delivery.

The contractor was able to finish the pump chamber promptly and reduced the cost of maintaining an excavation during high water table and severe weather conditions.

Scroll to Top

Login

Welcome to our website!

Users from our old website: Our apologies for the inconvenience, but if this is your first time visiting our new site you will need to create a new account .

If you are a returning user, please login below.

To access DWG drawings you must log in.

If you are new user create an account here.

If you are a returning user, please login below.

To access DWG drawings you must log in.