BOAT RAMP INSTALLATION

August 20, 2015 / Case Studies

ABOUT THE PROJECT

The contractor was able to install the precast panels and not be concerned about pouring the boat ramp sections during tidal conditions. This allowed the contractor to work all day even when the tide was approaching the top of the shoring.

STRUCTURE DESCRIPTION

Project consisted of installing twelve Precast Concrete Boat Ramp Panels. Precast Concrete was designed in order to accommodate the tidal conditions. The panels were 6’ x 16’ and were mounted together using stainless steel brackets embedded in the concrete. The concrete mix was a DOT design using epoxy reinforcement. Shea Concrete was able to manufacture and deliver the panels according to the contractor’s schedule.

Installation

Blossom Street Boat Ramp
Lynn, MA

Civil Engineer

Bourne Consulting Engineering
Franklin, MA

Site Contractor

Meninno Construction
Lynn, MA

 
Scroll to Top

Login

Welcome to our website!

Users from our old website: Our apologies for the inconvenience, but if this is your first time visiting our new site you will need to create a new account .

If you are a returning user, please login below.

To access DWG drawings you must log in.

If you are new user create an account here.

If you are a returning user, please login below.

To access DWG drawings you must log in.